Skip to main content

Build vs. Run

Every client need falls into one of two modes. The mode determines how work is priced, planned, and delivered — and together they give you both new capability and a system that keeps getting better.

Build

Creating Something New

A defined deliverable — a new CRM configuration, API integration, automation, dashboard, portal, or data migration. It has a beginning, middle, and end.

Priced in Units — a fixed-price measure of output, agreed before work begins. From $350/Unit.

Run

Advancing the System

Proactive advisory, planning, platform management, monitoring, optimization, and strategic guidance that keep your system aligned to the business as it evolves.

Flat-rate monthly program (Advance Continuous). $1,428–$3,850+/month by tier.

We don’t bill by the hour. We price by the deliverable and by the program — so you always know what you’re paying before we start, and budget risk is ours to manage, not yours.

What Is a Sprint

An Enable Sprint is a fixed batch of deliverables — typically 20 Units, about two weeks of production — priced and approved in writing before work begins.

Why Things Take the Time They Take

Nobody — Enable included — knows what’s inside a system until someone looks. Optimistic quoting without discovery is how projects blow past their estimates. The honest response is scoped discovery first, not a guess dressed up as a timeline.

A migration quoted at 6–8 weeks ran 26. A pre-signature data audit would have found the 2,700 broken records in week one instead of month five.
The client’s data export was 25x larger than scoped. Nobody had looked.
A system retirement declared an annual goal three years running.
The prospect had already spent $300K on a failed CRM. Nobody priced that risk.

We don’t guess. Anything uncertain gets scoped in a fixed-fee discovery step before you commit a dollar to build.

The Engagement Ladder

The ladder is a spine with lanes — not a staircase you must climb one step at a time. Most new clients enter through Advance Launch: the first three rungs, one contract, twelve months.

Flagship — New Client Entrance

Advance Launch
Your first 12 months, one contract

First half: project delivery with gates. Transition to Continuous is signed at day one, not renegotiated at month six. Second half: quarterly Continuous billing while the system stays in motion.

Problem-shaped entrances
Advance Specialty

Named programs for specific needs — Call Capture, SOP Guided Advisory, Digital Transformation Advisory, UCaaS, and more. They can join the spine at any point; they are not a later rung you must wait for.

Browse specialty programs →

When nothing fits
Advance Custom

Composer of last resort — compose exactly the engagement from the service catalog when standard Launch, Continuous, or Specialty shapes do not fit. Never the standard motion: if every client got it, it wouldn’t be custom. Service catalog →

When a Scope Is Ready — Two Paths

When a scope is ready, you choose — take the blueprint and build it with any team, or approve the Sprint and we build it. Both are good outcomes.

Path A

Take the blueprint

You receive a complete, buildable scope package — requirements, design, and Enable’s build budget attached. Build it with your team, another partner, or come back to us later.

Clean exit. No hostage scoping. The relationship continues on your terms.

Path B

Approve the Sprint — we build it

You approve a fixed Unit batch in writing. Enable executes the Sprint under the governance cadence, delivers for acceptance, then scopes what’s next.

Same starting point. Either path begins from a scope you can understand before a dollar of build is spent.

Both paths end the same way: the work stays mapped under the relationship. You buy the next thing when the next thing is ready — never before.

Our Scope Commitment

Scope discipline is a client-facing promise, not an internal policy:

Decision ledger

Every scope decision is logged — what was approved, when, and by whom — so the record is shared, not tribal.

48-hour notice

Any work that would fall outside approved scope triggers written notice within 48 hours. No silent expansion.

Parking Lot

Ideas that surface mid-Sprint are captured, reviewed at the next planning session, and converted to future Sprints when prioritized.

Advance Launch — How Most New Clients Engage

Advance Launch is the flagship new-client program: Discovery, Project Sprints, and Advance Continuous bundled into one 12-month contract. The Continuous transition is signed at day one — not proposed at month six.

Months 1–6
Strict project phase
At midpoint
Contractual Continuous transition
Months 6–12
Quarterly Continuous billing

First half runs as a strict project — SOW, staged milestone payments, delivery gates. Second half bills quarterly as Advance Continuous while Sprints continue on a planned cadence. That is the glide path productized: upfront deliverables, then ongoing partnership, without a second sale at month six.

Project Sprints — How Build Work Executes

Step 1
Propose
Step 2
Scope & Estimate
Step 3
Client Approves
Step 4
Execute
Step 5
Deliver & Accept
Step 6
Scope Next
  • Sprint size: a fixed batch of deliverables — typically 20 Units, about two weeks of production; the SOW documents your Sprint structure.
  • Budget approval: you approve each Sprint budget in writing before work begins — no exceptions.
  • Parking Lot: ideas that surface mid-Sprint are captured, reviewed at the next planning session, and converted to future Sprints when prioritized.
  • 30-day correction window: each deliverable includes a 30-day correction period for issues within the approved scope.
  • Standalone Projects: single-phase engagements at the same Unit pricing; deposit to open, balance staged to the delivery schedule in your SOW.

Service Levels & Response

Your response tier is set by your Advance Continuous program. All SLA clocks run Monday–Friday, 9 AM–6 PM Eastern; items submitted outside hours queue for the next business day.

TierApplies ToResponse
HighOrchestrated4-hour initial response
PriorityAdvisory2–24 business hours
StandardActive4–48 business hours
Advisory / StrategicAll tiersNext scheduled session

Governance & Communication

CadenceFrequencyPurpose
Delivery Check-InWeekly / bi-weeklySprint progress, blockers, decisions
Sprint Review & PlanningEvery 2 weeksAccept deliverables, scope next Sprint
Quarterly Business ReviewQuarterlyRoadmap, performance, planning
Executive SummaryMonthlyStatus and outcomes for leadership

Every scope decision is logged. Any work outside approved scope triggers written notice within 48 hours. Sprint scope and budget are approved by your project lead; new engagements or tier changes by your executive sponsor.

Creative Solutioning & Design

We bring creative and design capability to every engagement — not as an add-on, but as part of how we build:

  • UX-led configuration — layouts and interfaces designed for adoption, not just function
  • Brand-aligned custom pages — portals, microsites, and proposal assets built to your visual identity
  • AI-augmented design workflow — faster iteration and consistent visual quality
  • Zoho Creator & custom app UI — purpose-built interfaces for workflows standard apps don’t address

AI-Augmented Delivery

Our delivery stack is AI-augmented at every stage — part of why our Unit rates deliver more value per dollar than traditional hourly consulting.

StageApproachOutcome
Discovery & planningTranscript intelligence + architecture toolingWeeks of planning compressed into days
Scoping & SOWAI-assisted scope extraction and draftingAccurate, consistent SOWs faster
Build executionAI-assisted developmentSenior-level output from a lean team
CommunicationAI-assisted briefing and follow-upYou’re always informed; no dropped balls

Payment & Engagement Terms

  • New clients: 50% on proposal acceptance, remainder as milestone payments defined in the SOW.
  • Existing clients: standard Sprint terms — 50% at kickoff, 50% on delivery.
  • Advance Continuous: annual commitment billed quarterly in advance; annual prepay saves ~10%.
  • System Architecture Audit: 100% at kickoff, fixed price confirmed at scoping.
  • Methods: Check, ACH, or wire transfer (3–4% fee for credit card).

Onboarding & First 90 Days

PhaseTimelineWhat Happens
Discovery & ScopingWeeks 1–2Stakeholder interviews, scope definition, SOW approval
KickoffWeeks 2–3Team intros, access, environment setup, Sprint 1 launch
Sprint ExecutionWeeks 3–12Active build, weekly check-ins, bi-weekly reviews
Adoption & Go-LiveMonths 3–5UAT, training, go-live, 30-day correction window
Advance ContinuousMonths 4–5We propose the right ongoing program

Clients entering Advance Continuous directly — without a preceding project — begin with a one-time System Architecture Audit ($5,000–$10,000, scoped per environment) so we have the operating knowledge to manage your system responsibly.

Want to see how this works for your business?

We’ll walk you through the model and what your first 90 days would look like.

Schedule a Free Consultation →